Jumbo Offshore: The Greater Gabbard Project - Transition Piece transportation and installation
Jumbo Offshore used its' DP2 Heavy Lift Vessel Jumbo Javelin to transport and install 131 Transition Pieces for client Fluor at the Greater Gabbard Offshore Windfarm. Jumbo pioneered the transport from the port of Flushing (Netherlands) to the Offshore installation site at the East coast of the UK and installation with a free floating vessel, which makes transit to the worksite and positioning next to the monopile a lot faster then more conventional methods using Jack-up vessels. With a workability for critical lifts in wave heights up to at least Hs = 1.5m*, Jumbo Offshore is now able to deliver various installation services for offshore wind farms.
Comments
-
ok, great engineer power to invent this anti waving installation, but the video shows a bit to nice conditions as usual. how often is on windy and rough offshore fields such a mirror flat sea surface?? its good , but not suitable for whole year and rough conditions installation like lift platform vessel are.
-
Amazing
2m 47sLenght
28Rating