Boskalis Thien Ung topside installation AHIII
For Vietsovpetro Thien Ung project, Boskalis has installed the Thien Ung BK-TNG 4,200 meter topside and 850 meter living quarter by offshore heavy lifting with the sheerleg Asian Hercules III. It was the world’s heaviest lift installation of a topside by a sheerleg in an offshore environment to date. Vietnam, September 2016.
2m 32sLenght
17Rating